The Town of Stratford is accepting proposals for the design, construction, and installation of an on-site solar photovoltaic (PV) system in Stratford, between Bunbury Road and Hollis Ave, off of the newly constructed John Joe Sark Drive.
This work also includes environmental protection measures, site preparation, underground electrical, ground mount structures and associated foundations, PV generating equipment, and reinstatement.
Sealed proposals clearly marked “RFP for Town of Stratford, Community Campus PV Array Design Build, Contract 222617.01” will be received at Town of Stratford, 234 Shakespeare Drive,
until 2:00 p.m., local time on March 20th, 2024.
Electronic copies of documents may be obtained by downloading the files below or by contacting CBCL Limited at
[email protected].
-
RFP Specifications